Arrowhead Beach – Brookfield, CT

In March 2023, the Arrowhead Beach Association engaged CT Precast for a project originally slated to commence before Memorial Day of that year. However, due to geotechnical considerations, the decision was made to initiate the project after Labor Day. The Recon wall system was implemented as a replacement for an aging wall that was starting to fail. The block was delivered by LRM pick-up and CT Precast in a single day. The entire Arrowhead Beach wall construction process was completed in less than two weeks.

Local Supplier: CT Precast

Structure: Gravity Retaining Wall from Recon Wall Systems

Objective: Replace the aging wall with a Recon wall to ensure improved structural integrity. This enhancement contributes to the long-term stability and safety of the structure. The replacement also contributes to the visual appeal of the area.

Challenges Faced: Geotechnical concerns

Outcome:

  1. Enhanced Structural Integrity
  2. Improved Aesthetics
  3. Property Value Preservation

 