The use of the Recon Gravity Wall System made it possible for the wall to be placed near the...
University & Fairview Apartments, West St Paul
This new wall provided an access ramp to reach the underground parking garage. In addition, the...
Boston Scientific, Maple Grove MN
The new wall addressed grade changes on site allowing the drive lane to be constructed while...
Normandale Lake Townhomes Retaining Wall Repair, Bloomington MN
This new wall created a long term, low maintenance solution that prevented excavation/removal of...
Ballantrae Apartments, Eagan MN
The new wall addressed grade changes on site, allowing the building pad and parking lot to be...
Elan Uptown Luxury Apartments, Minneapolis, MN
The Midtown Greenway Bike Trail running through south Minneapolis has seen significant...
Stillwater Mills, Stillwater, MN
The Challenge How to design for a 12.2 m (40 ft) change in grade along the backside of a proposed...
O’Hare Airport Drainage Channel, Chicago, IL
In 2011, the City of Chicago moved forward with a project to create a drainage channel to...
Target Store, Rochester, MN
The new Target Store building site in Rochester, MN presented a difficult challenge to the...